Building Division
This divisions deals with all medium to large scale building projects.
​
Our highly skilled management team has a proven track record in executing world class projects and believe in close relationships and cooperation with Project Managers, Architects, Quantity Surveyors and Consulting Engineers ensuring projects are completed according to plan and within expectations.
​
The building division has performed projects across various disciplines which include, but are not limited to:
• Shopping Centers • Commercial and Public • Hotels, lodges and leisure • Industrial • Institutional • Residential
Projects
Mokuti Etosha Lodge
In the heart of Namibia’s wilderness, by the Etosha National Park, stands Mokuti Etosha Lodge — a testament to human ingenuity and nature’s grandeur. Mokuti has reimagined their experience with a new Pool Bar, Restaurant & Buffet area, Conference center and many more. The interior and externals were brought together with the art and designs to produce a place to escape into a world of natural beauty and luxury.
With a dynamic team that achieved the impossible by fast-tracking the construction period to only 11 months, which included 2 months of demolition works and 9 months of construction works. Namibia Construction together with City Concrete was behind the construction of this architectural marvel, we wove over 60 tons of structural steel and about 2500 m3 of concrete into a tapestry of luxury and adventure.
We are proud that we were able to uplift the region and immediate community by creating over 200 jobs during this period.
Hilltop Village
The recently developed Hilltop development plaza was completed at the end of November 2022. Situated right next to one of Namibia’s biggest malls – The Grove Mall of Namibia.
The primary concept is a multi-use building comprising of retail, food and beverage outlets on the ground floor and a 1st and 2nd floor office space with a total 8,500m2 leasing area. We are proud to have delivered this project for Demushuwa Properties and with Food Lovers Market as the anchor tenant.
An attractive development for the consumer, creating about 300 jobs on this project. Constructed over a 16-month period with complex construction features including a 15m cantilever beam that was engineered into the design as a unique feature from the outside deck while creating curiosity about what it would be like inside the building.
Atlantic Cold Storage
Situated in the country’s main harbor town, Walvis bay. This cold storage facility is strategically located to support and provide ideal cold storage facilities to the harbor and fish factories.
With an undercover area of close to 7 000m2 the construction of these cold storage and office facilities provide an atmosphere-controlled condition to store goods for the long-term storage